A solar interconnection inspection in Ohio is the code approval a solar array needs before its interconnection agreement with an investor-owned electric utility takes effect and the array can be turned on. Who performs it depends on whether the jurisdiction requires a permit for the work, and on what the utility company accepts.
Building Compliance Solutions inspects rooftop and ground-mount solar in twelve Central Ohio counties, and the company's owner is a NABCEP Board Certified PV System Inspector. Where the utility company accepts one, a private inspection from Building Compliance Solutions documents the system in the form the utility asks for.
What inspection does a solar installation need before it is turned on in Ohio?
A solar installation on an Ohio investor-owned utility's system needs approval from the electric code officials with jurisdiction before its interconnection agreement takes effect. Ohio Administrative Code 4901:1-22-10, paragraph D, makes that approval one of the milestones the agreement waits on. The current version of the rule took effect March 25, 2024.
Paragraph D of the rule names a second milestone: the applicant gives the utility a certificate of completion, or the system passes an on-site operational test, unless the test is waived. Utility personnel or a qualified third party observes the test.
Ohio's interconnection rules cover investor-owned electric utilities only. Ohio Administrative Code 4901:1-22-01 defines the electric distribution utility the chapter applies to as an investor-owned electric utility that owns and operates a distribution wires system. Electric cooperatives and city-owned electric systems are outside that definition, so a customer of one should ask it what it requires. Rule 4901:1-22-01 also counts energy storage that can export power as a distributed energy resource, alongside generators.
The interconnection rules do not replace local law. Ohio Administrative Code 4901:1-22-02 says they do not relieve an applicant from complying with federal, state, and local laws and ordinances, so a building permit the jurisdiction requires still applies.
Who approves a solar installation: the building department or a private inspector?
Permitted solar work is inspected and approved under the authority of the building department that issued the permit. Where the jurisdiction does not require a permit for the work, ask the utility company what inspection it will accept.
Union County's building department shows what the permitted path looks like. Its Photovoltaic FAQ Sheet says:
- The residential building permit application covers both the building and the electrical trades for a rooftop system.
- The required inspections are set during plan review, and most PV systems typically need an electrical final and a building final, with no midpoint inspection.
- The two finals usually mean two separate inspectors.
- The county has no custom electrical requirements for solar.
A private inspection gives the utility company a certified third-party inspection and a signed report in the form it asks for. Requirements vary by utility company and by the type of service, so ask while the system is still being built. The guide to electrical inspection before power is turned on covers the same question for a new electrical service.
Which codes does a solar inspection in Ohio follow?
A solar inspection in Ohio follows the National Electrical Code for the electrical work and the Ohio building code that fits the building for the structure. Union County's Current Ohio Code References sheet, dated January 28, 2026, lists the editions in force there as of that date:
| Work | Building code | Electrical code | This pair since |
|---|---|---|---|
| Residential | 2019 Residential Code of Ohio | 2023 National Electrical Code | April 15, 2024 |
| Commercial | 2024 Ohio Building Code | 2023 National Electrical Code | March 1, 2024 |
Article 690 of the National Electrical Code, NFPA 70, covers solar PV systems, including the array circuits, the inverters, and the controllers.
Union County reviews the roof as well as the wiring. The county says residential rooftop systems must be designed and installed for the applicable dead and roof loads, and it requires engineering documentation from a design professional showing compliance with Residential Code of Ohio section 324.4 before it approves the plans.
Interconnection carries standards of its own. Ohio Administrative Code 4901:1-22-03 names IEEE 1547 and 1547.1, UL 1741, and NFPA 70, each in the edition the rule lists or the later version controlling when the interconnection application is submitted. Under Ohio Administrative Code 4901:1-22-06, approval under level 1 review requires inverter-based equipment certified to those IEEE and UL standards and a nameplate capacity of 25 kilowatts or less. One of the level 1 approval criteria is that the installation complies with applicable codes and standards.
What does a solar interconnection inspection check?
A solar interconnection inspection includes the racking, conductors, disconnects, labeling, and rapid shutdown, the five items Building Compliance Solutions inspects on rooftop and ground-mount systems. The PV System Inspector task list from the North American Board of Certified Energy Practitioners (NABCEP), with section 690.12 of the code for rapid shutdown, spells out what each one involves:
| What gets checked | What the inspector looks at |
|---|---|
| Racking | The number, type, and location of roof attachment points, the flashing and weather sealing, racking and module attachments installed to their listing, and the array laid out to meet the code's setback requirements |
| Conductors | Wire sized for the circuit current, rated for the circuit voltage, and suited to where it runs, with raceways secured and every termination secure and rated for the circuit |
| Disconnects | Mounted securely, with working clearance, and labeled |
| Labeling | Durable labels at the AC interconnection point, the DC raceways, the disconnects, the main service panel, the inverter, and the rapid shutdown system |
| Rapid shutdown | The rapid shutdown system labeled where it applies, and the code's limits on the shock hazard to firefighters (below) |
NABCEP's list also covers grounding, the sizing of overcurrent protection, and the interconnection point, where the inspector checks that the current fed to the busbar stays within code limits and that the overcurrent protection on a supply-side connection is installed properly. For a ground-mount array, the list adds two checks: DC conductors that are not readily accessible, and the foundation inspection documentation where one applies.
Rapid shutdown is section 690.12 of the National Electrical Code. Where it applies, the 2023 edition gives two ways to control the shock hazard to firefighters inside the array boundary, the area the code draws around the array. One is a listed or field-labeled PV hazard control system. The other limits the highest voltage inside the array boundary to 80 volts or less within 30 seconds of rapid shutdown initiation. The device that starts rapid shutdown can be the service disconnect, the PV system disconnect, or a readily accessible switch that plainly shows whether it is off or on. On a one- or two-family dwelling, that device sits at a readily accessible location outside the building.
An inspection from Building Compliance Solutions ends in a pass or a correction list. Every correction names the specific condition, cites the code section, and says what corrects it.
What should be on site for a solar inspection?
For a permitted solar inspection in Union County, the approved plans, the manufacturers' installation instructions, and the product information for all the equipment have to be on site. The county's FAQ adds that the inspector generally needs access to the attic, that the contractor's representative may need to provide a ladder depending on the job site, and that a representative on site does not need to be an electrician.
When you request an inspection from Building Compliance Solutions, have four things ready:
- The job site address and the jurisdiction
- Which utility company is waiting, and what it asked for
- The date the work will actually be ready
- A site contact, and any gate codes
If the system does not pass, you get the specifics, so the fix takes one trip. The re-inspection goes on the schedule before the inspector leaves.
Where does Building Compliance Solutions inspect solar?
Building Compliance Solutions inspects solar in Franklin, Delaware, Licking, Fairfield, Union, Madison, Pickaway, Fayette, Knox, Morrow, Marion, and Logan counties. NABCEP describes a PV System Inspector as someone who inspects residential and commercial PV systems for authorities having jurisdiction, utilities, state incentive programs, and financing companies. The company's owner holds that board certification. Send the job details through the inspection request form and we will come back with a confirmed window.
Published November 10, 2026. By Building Compliance Solutions, LLC.