<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0">
<channel>
  <title>Building Compliance Solutions: Inspection and Code Guides</title>
  <link>https://buildingcompliancesolutionsllc.com/blog/</link>
  <description>Inspections, utility sign-off, and plan review in Central Ohio.</description>
  <language>en-us</language>
  <item>
    <title>Solar Interconnection Inspection in Ohio: What Gets Checked</title>
    <link>https://buildingcompliancesolutionsllc.com/blog/solar-interconnection-inspection-ohio</link>
    <guid isPermaLink="true">https://buildingcompliancesolutionsllc.com/blog/solar-interconnection-inspection-ohio</guid>
    <pubDate>Tue, 10 Nov 2026 12:00:00 +0000</pubDate>
    <description>In Ohio, an investor-owned utility&#x27;s interconnection agreement for a solar array is not effective until electric code officials with jurisdiction approve the system. Here is what a solar inspection checks and what to have on site.</description>
  </item>
  <item>
    <title>What a Third-Party Building Inspection Agency Does in Ohio</title>
    <link>https://buildingcompliancesolutionsllc.com/blog/third-party-building-inspection-agency-ohio</link>
    <guid isPermaLink="true">https://buildingcompliancesolutionsllc.com/blog/third-party-building-inspection-agency-ohio</guid>
    <pubDate>Tue, 03 Nov 2026 12:00:00 +0000</pubDate>
    <description>In Ohio, a third-party building inspection agency reviews plans and makes inspections for a city, village, township, or county under contract, on that jurisdiction&#x27;s behalf, with people the Board of Building Standards certifies. Here is how the arrangement works under state law, and what changed in 2025.</description>
  </item>
  <item>
    <title>Electrical Inspection Before Power Is Turned On in Ohio: What the Utility Needs</title>
    <link>https://buildingcompliancesolutionsllc.com/blog/electrical-inspection-before-power-is-turned-on-ohio</link>
    <guid isPermaLink="true">https://buildingcompliancesolutionsllc.com/blog/electrical-inspection-before-power-is-turned-on-ohio</guid>
    <pubDate>Mon, 02 Nov 2026 12:00:00 +0000</pubDate>
    <description>In Ohio, an investor-owned electric utility cannot energize a new service until the meter base and the equipment behind it have been inspected. Who performs that inspection depends on where the job is and what was built.</description>
  </item>
</channel>
</rss>
